Tailored for Marin Remodels
Eichler & Mid-Century Retrofits
Many homes in Lucas Valley and Terra Linda are Eichlers with aging radiant systems. A remodel is the critical time to pressure-test existing loops, flush decades of sediment, or install modern manifolds that give you room-by-room temperature control.
Modern manifolds for room-by-room control
Hard Water Protection
Unlike San Francisco, Marin has harder water that scales up boiler heat exchangers. When we install or upgrade a system during your remodel, we include proper filtration and treatment components to ensure your high-efficiency equipment lasts for decades.
Filtration and treatment included
Code & Title 24 Compliance
Marin County and the City of Novato both require permits for heating system work. California’s Title 24 energy code sets strict standards for new heating equipment efficiency. We handle all permitting and compliance as part of every remodel project.
All permitting and compliance handled
Retrofit Installation Methods
Joist-Bay Staple-Up (for Crawl Spaces)
Many Marin homes are built over crawl spaces. We install radiant tubing from below without disturbing your finished floors — stapled to the subfloor with aluminum transfer plates to drive heat upward.
Low-Profile Panel Systems
For slab-on-grade Eichler homes or second-story additions, we use thin panels that sit on top of the existing subfloor. These add minimal height — often under 3/4″ — and provide excellent heat output.
Manifold Upgrades
We install modern zone manifolds to replace old single-zone systems, giving you individual room control via thermostats. This dramatically improves efficiency and comfort in larger Marin homes.
Boiler or Heat Pump Upgrade
Most remodels are the ideal time to upgrade the heat source. We recommend replacing aging gas boilers with high-efficiency condensing units or transitioning to an air-to-water heat pump for full electrification.
Why Marin Remodelers Choose Us
Marin Remodel Radiant FAQs
How disruptive is adding radiant during a kitchen or bathroom remodel?
Since you’re already opening up the floor or walls, it’s the lowest-impact time to add radiant. We coordinate with your GC to install tubing before the subfloor or tile goes down. The disruption is minimal compared to adding radiant to a finished home.
My Eichler remodel is replacing the existing boiler. What’s your process?
We pressure-test the existing in-slab loops first. If they hold pressure, we flush the system and connect your new high-efficiency boiler. If any loops leak, we can often isolate or abandon them without opening the slab. Learn more about our Eichler process →
Can I add zones to my existing single-zone radiant system?
Yes. We install a modern manifold and zone valves, then wire individual thermostats to each zone. This lets you control room temperatures independently — a significant upgrade from a single thermostat controlling the whole house.
What floor coverings work over my existing radiant system?
Stone, tile, and engineered hardwood are ideal. Solid hardwood works if surface temperatures stay below 82°F. We work with your flooring contractor to confirm compatibility before installation.
